We recently installed a concrete slab in the ground. Why?

So we can anchor 3 tanks to equalize our brewery wastewater before it goes into our pretreatment system.

Our process waste, though all organic material, could pose many problems to a small village’s wastewater treatment plant if untreated. We are now installing our own treatment system onsite at the new brewery that will bring our waste load down to residential levels. This not only frees up space at the Village’s wastewater treatment plant, and allows room for more businesses to move to the area, but it also reduces our overall water consumption by allowing us to use the water twice before it goes down the drain!

Stay tuned for more progress!

img_0924

img_1145